bad at Trident shohin - from scratch progression

Messages
474
Reaction score
706
Location
Eastern MA
USDA Zone
6B
Not much to share yet but i’m excited for this one and thought I’d start to document it.

Goal is to turn this trident into two shohin.


oZqaL7P.jpg


The first will be centered around the existing nebari. So we are looking at a chop for this one.

TYPJNwK.jpg


and for the second, I took some 6ga wire and put it through a bicycle tube and did this

0cmaWuj.jpg


goal is to create a pre air layer where the tree swells around the wire. Next step will be to air layer it off once it spreads a bit due to the wire.

Pumping with 12-8-8 for now. I cut that bottom bit / las loop of wire off as I don’t think I need it
 

Similar threads

Top Bottom